Special Hanging System on Cleveland Clinic

Description

Orientals was contracted for the design, manufacturing, supply and installation of a special hanging system on top of the construction site of Cleveland Clinic.

The required structure was to be installed on the BMU dual tracks to carry a 6m cradle 4m out of the building. The system was not supposed also to exert any  uplifting load on the tacks. Therefore, it was made completely with counter weights.

The system had also a material winch with motorized trolley to move it along the 6m of the system width.

Summary
Completed on

October 10, 2012

Skills

Special Hanging System

Client

Sixco