Orientals scope was to design, manufacture, supply and install the BMU system at W-Hotel project in Amman. After many studies made with the main contractor and the consultant, the monorail option was selected.
On the podium buildings a horizontal monorail system was installed with OSLER BMU basket. There are 4 separate rail in th eposium.
In the tower, a climbing rail was installed to follow the shope of the parapet. There are 4 separate rails as well.